Chevelle Update: Body's on the rotisserie and the suspension goes on!
Published: Wed, 11/23/11
|
The MuscleCar Place Blog |
October 26, 2011 |
Happy Thanksgiving!!Since we're in a rush to get the shop closed for the holiday, this will be the first of 2 e-mails we'll send out today.
First, the blog. In an hour you'll receive the podcast show update!
=================================================
Chevelle Build Update:The Body is on the Rotisserie and the DSE Suspension is Going on the Frame! It seems as it's been forever since I've written the last Chevelle
update on the build occurring at Allison Customs, but when we last left off the mini-tub job
had just been completed and the trunk floor was about to go in. Today
the entire trunk floor is in and done, which is no small feat
considering Jeff had to literally fabricate every single panel that the
new trunk floor was to weld to. He ended up creating an entire new tail
panel for the car (which is the piece that ties the left and right side
of the body together - just behind the bumper). Once that was done he
had to create all of the internal places to mount the wheel tubs, and
since the tubs were wider than original he had to relocate a few things
to make it all work. In the end though the trunk floor went in and now
the rear of the body is more solid than it's been since the mid 1970"s!
Home of the world's best muscle car podcast.
|
Podcast Sponsors!
|


